top of page
Planning Variation

Planning Application for Change in Turbine Type & Crane Pads

As these are the only changes, this Amendment Application:-

  • Does not increase the overall height of each wind turbine as a smaller tower will be used.

  • Does not increase the number of wind turbines on the site.

  • Does not change the location or positions of the wind turbines from the original planning consent.

  • Does not change the access tracks or any associated infrastructure.

 

SWF Site Layout.png

The proposed change of rotor (blade) size will facilitate the installation of more modern turbines which are more efficient in terms of generation capacity, reflecting the changes and improvements in turbine technology that have occurred over the last eight years.

Irrespective of the outcome of this latest planning application, it is anticipated the building of the seven wind turbines will take place early 2022. 

 

The purpose of this online exhibition is to provide local people the opportunity to find out more about the updated plans.

 

The relevant planning reports and Environmental Statement to support the planning application can be downloaded below.

bottom of page