top of page

Transport

Proposed transport route to Smulgedon Wind Farm

The wind turbines will be brought to site from one of a number of possible ports along the public road system. A detailed transport study will be presented as part of the planning application outlining the route, number and timing of abnormal loads.

 

Details of construction traffic routes will also be presented in this study. All routes will be monitored and recorded and any damage caused will be rectified by RG Developments following construction. Traffic will also be managed to ensure there is no unacceptable local disruption.

bottom of page